Atlantic Blue Water Services » Leading Engineering, Procurement & Maintenance Service Providers

+234-805-709-9966

+234-818-513-3081

Km 14 East-West/Uniport Rd, Rumuosi

Port Harcourt, Nigeria

Projects

Fire & Gas Engineering Projects

Project Title Description Client Date/Period
SMOKE DETECTOR INSTALLATION Installation Of New Smoke Detector To Existing Zone INDORAMA ELEME PETROCHEMICALS October 2016
INSTALLATION OF NEW MANUAL CALL POINT Installation of new manual call points at new canteen facility near barrier C & linking to existing fire panel at substation 32 INDORAMA ELEME PETROCHEMICALS September 2016
FIRE ALARM SYSTEM SERVICES Provision, Installation and Servicing of Fire Alarm System in IPNL PLANT INDORAMA ELEME PETROCHEMICALS August 2016
FIRE ALARM SYSTEM SERVICES Provision And Installation Of Fire Alarm – Smoke Detector Checks EPCL/INDORAMA July 2016
ANNUAL MAINTENANCE OF FIRE ALARM SYSTEM Annual maintenance of fire alarm system at in IPNL EPCL/INDORAMA May 2016 – May 2017
ANNUAL MTCE CONTRACT FOR FIRE ALARM EQUIPMENT- SMOKE DETECTORS, HEAT DETECTORS, MANUAL CALL POINTS ETC Bi-annual mtce/functioanlity checks of smoke detectors, heat detectors, MCP’s etc in progress EPCL/INDORAMA Nov 2014
ANNUAL MTCE CONTRACT FOR FIRE ALARM EQUIPMENT- SMOKE DETECTORS, HEAT DETECTORS, MANUAL CALL POINTS ETC Bi-annual mtce/functioanlity checks of smoke detectors, heat detectors, MCP’s etc in progress EPCL/INDORAMA Oct 2013
ANNUAL MTCE CONTRACT FOR FIRE ALARM EQUIPMENT- SMOKE DETECTORS, HEAT DETECTORS, MANUAL CALL POINTS ETC Bi-annual mtce/functioanlity checks of smoke detectors, heat detectors, MCP’s etc in progress EPCL/INDORAMA Sept 2012
ANNUAL MTCE CONTRACT FOR FIRE ALARM EQUIPMENT- SMOKE DETECTORS, HEAT DETECTORS, MANUAL CALL POINTS ETC Bi-annual mtce/functioanlity checks of smoke detectors, heat detectors, MCP’s etc in progress EPCL/INDORAMA Oct 2011
ANNUAL MTCE CONTRACT FOR FIRE ALARM EQUIPMENT- SMOKE DETECTORS, HEAT DETECTORS, MANUAL CALL POINTS ETC Bi-annual mtce/functioanlity checks of smoke detectors, heat detectors, MCP’s etc in progress EPCL/INDORAMA Oct 2010
ROUTINE MTCE OF FOAM SYSTEM Valve greasing, removal of bird nest and performance test of Fixed Foam Systems EPCL/INDORAMA Oct. 2010
ANNUAL MTCE CONTRACT FOR FIRE ALARM EQUIPMENT- SMOKE DETECTORS, HEAT DETECTORS, MANUAL CALL POINTS ETC Bi-annual mtce/functioanlity checks of smoke detectors, heat detectors, MCP’s etc in progress EPCL/INDORAMA 2009
FIRE PROTECTION HANDBOOK Supply of NFPA Fire Protection Handbook and NFPA Fire Code Complilation EPCL/INDORAMA 2008
ROUTINE MTCE OF FOAM SYSTEM Valve greasing, removal of bird nest and performance test of Fixed Foam Systems EPCL/INDORAMA 2008
ROUTINE MTCE OF FOAM SYSTEM Valve greasing, removal of bird nest and performance test of Fixed Foam Systems EPCL/INDORAMA 2008
SEMI- ANNUAL COMPLEX FIRE & GAS PROTECTION SYSTEM MTCE Bi-annual Mtce of Fire and Gas Systems EPCL/INDORAMA 2008
CO2 FLOODING SYSTEM REVAMP Revamp of CO2 for Gas Turbine 1 Including supply of spares for the revamping PROPLANT INC., / NOTORE CHEMICAL INDUSTRIES 2008
QUARTERLY CHECK OF EPCL COMPLEX FIRE PROTECTION SYSTEM CHECK Carrying out of statutory availability and functionality checks and testing of all fire and gas detection and prevention systems in each of the plants in the petrochemical complex EPCL/INDORAMA 2007
DELUGE VALVE & SPRINKLER SYSTEMS FUNCTIONALITY CHECKS Supply of RELIABLE deluge valve spares EPCL/INDORAMA 2007
DELUGE VALVE & SPRINKLER SYSTEMS FUNCTIONALITY CHECKS Supply of WORMALD deluge valve spares EPCL/INDORAMA 2007
SUPPLY OF REQUIRED EQUIPMENT, TOOLS AND MANPOWER FOR FIXED FOAM SYSTEM MTCE Mtce of Fixed Foam Sytems EPCL/INDORAMA 2007
TAM Supply of manpower and materials for repairing/ replacement of the sprinkler system,sprinkler heads, servicing of the storage tank hydrant lines gatevalves,strainers, repairing of the deluge system of the chemical warehouse at EPCL EPCL/INDORAMA 2006
TAM Supply of manpower and equipment for smoke detector repairing in PE Plant EPCL/INDORAMA 2006
TAM Supply of manpower and equipment for gas detector repairing in PPUO area of Plant in progress EPCL/INDORAMA 2006
TAM Supply of manpower and materials for repairing/ replacement of PPUO fire protection system EPCL/INDORAMA 2006
TAM Supply of manpower and equipment for PP Plant fire protection system and halon system revamp EPCL/INDORAMA 2006
TAM Supply of Tyco’s SIMPLEX GRINNNEL Power Assembly EPCL/INDORAMA 2006
Smoke detector installation Installation Of New Smoke Detector To Existing Zone INDORAMA EPCL October 2016
Installation of new manual call point Installation of new manual call points at new canteen facility near barrier C & linking to existing fire panel at substation 32 INDORAMA EPCL September 2016
Fire Alarm System Services Provision, Installation and Servicing of Fire Alarm System in IPNL PLANT INDORAMA EPCL August 2016